Case Studies
Create Case Study

Newton Abbot Hospital

The location and the design of this brand new hospital presented many engineering challenges, being built, as it is, over clay mines and on a flood plain.

As a result, the quality of the concrete and stone products to be used on site were paramount - and Glendinning was called upon to provide a more reliable alternative when quality issues appeared with an existing supplier. As a result we supplied more than 4,000 m³ of concrete and supplied 18,000 blocks in the construction of the Hospital and neighbouring buildings.

For the finishing touches, we supplied 240 tonnes of Gabion Stone which is used as a design feature at the entrance to the hospital.