Case Studies

A38 Merafield Bridge Replacement

The demolition and construction of two new bridges over the A38 Devon Expressway demanded reliable supplies of structural ready mix concrete which Glendinning, with their plants well placed at Asburton and Plymouth, were able to successfully complete. The Interserve Sub Agent, Dave Pratt commented, "E&JW Glendinning have been a key member of our supply chain, by providing a superb quality of service, very competent techical support, a readily available back up plant and flexibility to meet our high demands to ensure our targets were met"

Project Information

Site: A38 Plymouth
Client: Highways England
Contractor: Interserve

Products Supplied

Ready Mix Concrete - 1500m3